Setting up a warehouse in Bengaluru's industrial zones — Peenya, Dobbaspet, Bommasandra, Hoskote, or Hosur Road — requires a substantial investment in infrastructure before your first consignment arrives. Most operators underestimate this cost, then scramble to fix it after operations begin.

This guide gives you current (June 2026) market rates for every infrastructure component of a warehouse fit-out in Bengaluru — so you can budget accurately before you sign the lease.

Important: These are Bengaluru market rate ranges as of June 2026, not quotes. Your actual cost depends on your warehouse size, existing infrastructure, operational requirements, and specification level. RC Workspace provides a detailed site-specific BOQ after a free site review — which is the only accurate way to price your project.

Warehouse Infrastructure Cost Summary — Bengaluru 2026

Infrastructure ComponentTypical Cost RangeBasis
LT Panel & Power Distribution₹8–₹18 lakhsPer facility, depends on incoming supply and distribution complexity
MS Cable Tray Network₹35–₹65 per sqftFull warehouse floor plate coverage
High-Bay LED Lighting₹55–₹90 per sqftIncluding luminaires, wiring, and emergency lighting
CCTV System₹35,000–₹65,000 per camera (installed)Including NVR, cabling, mounting — IP camera system
Intruder Alarm System₹4–₹12 lakhsDepends on perimeter size, number of zones, detector types
Fire Detection System₹20–₹45 per sqftSmoke/heat detectors, panel, hooters — addressable system
Network & Data Cabling₹30–₹55 per sqftStructured cabling + Wi-Fi for WMS/scanner coverage
Mezzanine Office Fit-Out₹1,000–₹1,600 per sqftOffice area above warehouse — MEP + interiors
Industrial Painting₹15–₹28 per sqftTwo-coat industrial epoxy or enamel on structure
Dock Infrastructure₹85,000–₹2,20,000 per dockLevellers, seals, dock lighting — varies significantly by spec

Total Warehouse Infrastructure Budget — By Facility Size

To make these rates concrete, here are typical all-in infrastructure budgets for common warehouse sizes in Bengaluru:

Warehouse SizeBasic InfrastructureFull Infrastructure (inc. mezzanine)
10,000 sqft₹45–₹70 lakhs₹80–₹1.2 Cr
25,000 sqft₹95L–₹1.5 Cr₹1.5–₹2.5 Cr
50,000 sqft₹1.8–₹2.8 Cr₹2.8–₹4.5 Cr
1,00,000 sqft₹3.5–₹5.5 Cr₹5.5–₹8.5 Cr

What's Included in "Full Infrastructure"

The "full infrastructure" figures above include:

What Drives Cost Variation

Building age and existing infrastructure

An older industrial building in Peenya with an aging substation and insufficient earthing requires more remedial work than a new KIADB shed in Dobbaspet or Hoskote with modern power infrastructure. RC Workspace's site review identifies these issues before you commit to a budget.

Operational requirements

A cold chain warehouse needs precision refrigeration power infrastructure that a dry goods warehouse doesn't. A hazardous materials store needs specific fire suppression that standard warehouses don't. An electronics warehouse needs ESD-safe environments. Your operational category determines your actual infrastructure specification and cost.

Security specification

The number of cameras, quality of NVR and storage, perimeter vs internal-only coverage, and whether remote monitoring is required all affect the CCTV cost significantly. A 10,000 sqft warehouse with 8 cameras costs very differently from a 50,000 sqft facility with 40 cameras, ANPR at gate, and remote monitoring integration.

RC Workspace's approach: We visit your warehouse before quoting. A site review identifies existing infrastructure that can be retained vs replaced, power augmentation requirements, and any structural factors that affect MEP routing. The BOQ we provide after the review is accurate — not a ballpark that triples by handover.

Frequently Asked Questions

Warehouse infrastructure in Bengaluru (excluding mezzanine office) typically costs ₹150–₹280 per sqft for a complete installation — covering power distribution, high-bay LED, CCTV, intruder alarm, fire detection, and network cabling. Mezzanine office fit-out adds ₹1,000–₹1,600 per sqft for the office area. RC Workspace provides a detailed BOQ after a free site review.
At minimum, a warehouse in Bengaluru requires a valid electrical installation with earthing, fire detection (for licensing), and basic lighting. For industrial licensing, HVAC and ventilation may also be required. For logistics and warehousing operations, CCTV is typically required by the warehouse operator's clients. RC Workspace builds to all applicable standards.
A complete warehouse infrastructure fit-out in Bengaluru typically takes 6–12 weeks depending on facility size and scope. Mezzanine office fit-out runs in parallel where possible. RC Workspace provides a Gantt-based schedule before any work begins.
Yes. RC Workspace delivers warehouse infrastructure fit-out across all major industrial zones around Bengaluru — Peenya, Dobbaspet, Bommasandra, Hoskote, Hosur Road, Nelamangala, Bidadi, Harohalli, and Malur. We have supplier relationships and site teams covering the full Bengaluru industrial belt.

Get an accurate cost estimate for your warehouse

RC Workspace visits your warehouse before quoting. Free site review, line-item BOQ within 48 hours. Zero cost, zero obligation.