The Project

Stance Health is a corporate wellness and sports performance centre serving corporate clients, athletes, and fitness-focused individuals in South Bengaluru. Their JP Nagar facility needed to be premium — a space that clients would trust with their health and performance — while also being MEP-compliant and operationally reliable.

RC Workspace was engaged for a complete fit-out: electrical infrastructure, cassette HVAC across all zones, CCTV and security, full interior finishes, branding elements, and reception fit-out.

The wellness centre challenge: Clinics and wellness centres have specific MEP requirements — dedicated electrical circuits for medical equipment, precise HVAC for active zones vs treatment rooms, and CCTV that covers all areas without compromising client privacy. RC Workspace designs all of this before a single partition goes up.

Scope of Work

TradeScope
Electrical & PowerDedicated circuits for medical/rehabilitation equipment, power distribution across all zones, emergency lighting, earthing
HVACCassette HVAC units across active rehabilitation floor, treatment rooms, and reception — zoned separately for temperature control in each area
CCTV & SecurityIP cameras covering entry, reception, main floor, and perimeter. Positioned to cover operational areas while excluding treatment room privacy zones.
False Ceiling & PartitionsBlack acoustic ceiling on main rehabilitation floor, glass-windowed consultation cabins, drywall partitions for treatment rooms
FlooringTwo-tone vinyl and sports turf flooring on main floor, vinyl in treatment rooms and reception
Branding & InteriorsNeon feature wall with custom MS frame, full-wall mirror installation, reception counter with backlit signage, track and linear LED lighting design
Glass & HardwareGlass entrance doors with SS hardware, glass cabin partitions with manifestation

The MEP-First Approach in a Wellness Centre

Wellness and clinic spaces have more demanding MEP requirements than standard office fit-outs. The rehabilitation floor needed enough power for multiple pieces of electrical physiotherapy equipment running simultaneously — a load that standard office power planning doesn't account for. RC Workspace modelled the connected load for every equipment position before designing the panel and distribution system.

HVAC zoning was critical: the active rehabilitation area generates significant heat load from both equipment and users, while treatment rooms need quieter, more controlled temperatures. A single-zone HVAC system can't serve both well. RC Workspace designed separate cassette units for each zone, with independent controls.

The result: Stance Health's JP Nagar facility opened on schedule with every system operational — equipment circuits running at full load, HVAC holding correct temperatures in each zone, CCTV live, and branding elements exactly as designed. No rework. No outstanding items at handover.

₹0
Rework — MEP designed before civil works began
100%
Equipment circuits operational at full design load
Day 1
Facility open and fully operational at handover
"What impressed us most was the MEP planning before the false ceiling went up. Zero rework. Day-1 operational. Exactly what was promised — and the portal made the whole process completely transparent."
SH
Facility Manager
Stance Health · JP Nagar, Bengaluru

Planning a clinic or wellness centre fit-out in Bengaluru?

RC Workspace has delivered medical and wellness facility fit-outs across Bengaluru. Free site assessment, line-item BOQ, Day-1 delivery.

Book Free Assessment → 📞 +91 96060 20779