HomeFree Pre-Lease Infrastructure Audit
Free · No Obligation · Within 48 Hours

Free Pre-Lease Infrastructure Audit

Before you sign a commercial lease, know exactly what the space will cost to fit out. RC Workspace audits the infrastructure and delivers a detailed report — free of charge, within 48 hours.

75K+
Sq Ft Delivered
₹0
Rework Cost
Day 1
Operational
48 Hr
Report Turnaround

Trusted by Ingram Micro  ·  Wheelhub  ·  Stance Health  ·  and 100+ Bengaluru companies

What You Receive

  • Power Assessment: Available kVA, panel condition, earthing status, BESCOM sanction — and whether it meets your operational load.
  • HVAC Review: Existing system type, age, condition, and capacity. Estimate of what you need to add or replace for your occupancy.
  • Network & Cabling Review: ISP fibre availability in building, existing conduit routes, Cat6/Cat6A requirement for your team size.
  • CCTV & Security Assessment: Existing camera positions and quality. What's needed for complete coverage. Access control gaps.
  • Fire Safety Review: Detector coverage, alarm panel condition, sprinkler loop status, NOC validity.
  • Infrastructure Risk Report: Clear summary of what needs to be fixed before you occupy and what is acceptable.
  • Ballpark BOQ: Indicative fit-out cost based on your scope requirements — so you can budget accurately before lease signing.

Request Your Free Audit

No sales calls. No spam. Site visit confirmed within 24 hours.

How It Works

Three steps from inquiry to detailed report — no cost, no obligation.

📋

1. Submit Request

Fill the form above with your project details. We'll confirm the site visit within 24 hours.

🏗

2. Site Assessment

RC Workspace visits the space and audits power, HVAC, cabling, CCTV, and fire safety infrastructure.

📊

3. Report in 48 Hours

You receive a detailed infrastructure risk report and ballpark BOQ — before you sign the lease.

What Does the Audit Cover?

SystemWhat We CheckWhy It Matters
Electrical SupplySanctioned load from BESCOM/ESCOM, panel condition, earthing, circuit capacityUndersized supply means costly BESCOM applications and panel replacements mid-project
HVACSystem type, age, tonnage, condition, condensate drainageOld HVAC is expensive to replace mid-lease. Capacity must match your occupancy load.
Network & CablingISP fibre in building, existing conduit routes, patch panel locationRe-routing conduits after false ceiling goes up costs 3x what it costs to do it first
CCTV & SecurityCamera positions, blind spots, NVR location, access control pointsSecurity gaps are expensive to retrofit. Blind spots require ceiling re-opening.
Fire SafetyDetector coverage, alarm panel, sprinkler loop, NOC validityNon-compliant fire safety blocks occupancy certificate and violates lease terms
Structural SuitabilityFloor loading, ceiling height, column positions, goods accessDiscovering structural limitations after lease signing is extremely expensive

Areas We Cover

We conduct free pre-lease infrastructure audits across all Bengaluru office and industrial zones: